Jan 1, 2011: Went out for breakfast, then to the grocery store. Purchased turnip & mustard greens, black eyed peas, kielbasa, and cornbread. Ate all of those things for dinner, for good luck. The black eyed peas are for luck with coin money; the greens for paper money. Cornbread is for health, and pork (kielbasa this time) is for prosperity.
Jan 2, 2011: Watched football.
Jan 3, 2011: Back to work after the holiday weekend. Ridiculously busy. Nothing to report.
Jan 4-7th, 2011: Work, work, work.
Jan 8, 2011: Petco and the grocery store. Husband got mad at Petco because some pet portrait place set up their table in such a way that we couldn't get over to the room where the adoptable cats are kept. His whole trip to Petco is ruined if he doesn't get to see the cats.
I made my first curry yesterday, in the crock pot, it was DELICIOUS. As soon as I figure out how to post pictures on here....
Jan 9, 2011...that's today. So far, I've had to go out in the 14 degree weather for Liquid Plumbr because my kitchen sink was backed up. AGAIN. This whole "living on the ground floor" thing has some drawbacks. Like, if the people above me have a tendency to run shit through their garbage disposals that doesn't go down, it clogs down here at the bottom of the building, and I get the flooded kitchen.
I'm watching football and eating leftover curry. We're having breakfast for dinner tonight: pancakes. Had I known Jimmy had that idea in his head, I'd have gotten some bacon or sausage at the store while I was buying the drain cleaner.
Oh, and I had pumpkin pie for breakfast.
No comments:
Post a Comment